The floating dock Rolldock Sun delivered INS Sindhurakshak to Severodvinsk on Aug 3. On Aug 6 dock operations were finished and the Indian sub was moored at the quay of JSC Zvezdochka Ship Repair Center.
Provisionally, on Aug 10 the sub will be put on a solid base of the shipyard's dock section; on Aug 17 the sub will be transferred to shipbuilding workshop No. 10 where all works on overhaul and upgrade will be performed.
No comments:
Post a Comment